Premises Monitoring Renovation JH002-Kingston, Jamaica 090731

Phase one was quite a painful experience. All wireways installed for the original special systems were either too small, crushed, blocked or lost in walls or underground. There were no as built plans or schematics and despite all efforts to contact all the original installers, none of those who we did find remembered where anything was. Property owners take heed. The money you think you’ve saved in the beginning will be lost as cost for repair and reinstallation of an improper or inadequate system. If properly designed and installed wireways and conduit should need minimal changes to upgrade with improvements in technology over decades of use. While adding infrastructure to cross the finished driveway we took advantage to repair an erosion problem that was dislocating finished pavers. Simple and proper PVC pipes put in the ground during construction could have saved most of this work.

Share on social media